Wow, what a difference ten days makes at this stage in a construction project!

If you look out now at the site you will see lots of steel structure – most of the lower floor of the lower building has its basic steel shape, and the definition of the upper floor is beginning to take shape. Today, another load of steel was delivered, and we expect another load or two in the next week or so.