This week the main work has been forming and pouring the next section of the major retaining wall at the back of the lower building. It has been fascinating to watch the rebar be encased in the heavy metal and wooden frames that form the dimensions of the wall.

Most of the initial plumbing is done, as well , and the under-slab drainage pipe has been put in place. Next week the slab for the floor of that lower building will be prepped and maybe even poured – weather and coordination permitting!